top of page

Dornal Project

We transformed a duplex into a single family residence. The back staircase became a reading nook with a skylight and storage. We turned the second kitchen into a spacious master bath with heated floors and a walk-in closet. We installed a new custom color front door and removed the supporting walls from the front entrance for an open and cohesive space. Between a new HVAC system and structural work to the foundation, this project was filled with wise improvements. Check out the step-by-step video of the master bath below!

Dornal Project

Chatillon Project

Our client had signed on to do 2 bathrooms with a contractor. As the first bathroom came to a close 2x over budget and 3 weeks behind schedule, they fired him and called us. We managed to give them their dream master bath, complete with an Italian shower, a jacuzzi tub, double vanity, heated floor and concealed air vents built into the floor to match the tile. Of course, we also ran all new electrical and plumbing and upgraded their panel for a worry-free home!

Chatillon Project

Mozart Project

A small leak turned into a big problem in this condo. A small gasket that failed on the 30 year old shower led to a pool of water going unnoticed under their floor for weeks. One day, they touched a wall and it crumbled, exposing severe mold growth in the wall cavity. We gutted the condo, decontaminated and treated for mold, completely redesigned it and built it back from scratch.

Mozart Project
bottom of page